Solar Mounting Aluminium Middle Clamp Side Clamp Nuts And Bolt
Product Details:
Place of Origin: | Langfang,Hebei,China |
Brand Name: | Goomay |
Certification: | ISO9001:2015,ISO14001:2015,ISO45001:2008 |
Model Number: | GM-TYN-22 |
Payment & Shipping Terms:
Minimum Order Quantity: | MOQ 500KGS For Initial Order,the quantity could be negotiable |
---|---|
Price: | Negotiable |
Packaging Details: | Inside: packed with plastic film to protect each piece. Outside: Wrap to be bundles by waterproof craft paper or EPE film. Customized as customers request is available. |
Delivery Time: | After drawings confirmed,4-7days moulds ready , after samples approved , 7-10days delivery for 200TONS |
Payment Terms: | 30%deposit+70% against BL copy, D/P, L/C |
Supply Ability: | 5000T MONTHLY |
Detail Information |
|||
Raw Materials: | Aluminium Ingot 6063-T5,T6 6061-T5,T6 | Surface Treament: | Mill Finish,Anodized, Powder Coated Etc |
---|---|---|---|
Wall Thickness: | 0.70MM Up And Customized Available | Brand: | Goomay Curtain Wall Aluminium Profiles |
Colour: | Mill Finish, Powder Coated, Anodized Silver And Customized Colours | Product Orgin: | Hebei,China |
Apllication: | Exterior Wall Decoration, Construction,Glass Curtain Wall | Hours And Certificate: | ISO9001:2015 ISO14001:2015 ISO45001:2008 |
High Light: | solar system Aluminium Middle Clamp,precision Photovoltaic Solar Aluminum Profile,Aluminium Middle Clamp Side Clamp Nuts |
Product Description
Solar Mounting Aluminium Middle Clamp Side Clamp Nuts And Bolt
Solar Mounting System And Accessories Aluminium Middle Clamp, Side Clamp,Nuts And Bolt
Product Specifications:
Product Code | GM--TYN- 02 |
Place of Origin | China |
Brand Name | Goomay |
Surface treatment | Mill finish/Anodized/Powder Coated/Electrophoresis |
Alloy | 6063/6061/6005/6082/6060 |
Temper | T5/T6 |
Thickness | 0.70mm up--Customized |
Applications | Aluminum profile for Solar Mounting System and Accessories |
Length | 5.8 Meter or customized length |
Certification | ISO9001,ISO14001,ISO45001 SGS |
MOQ | 500KGS |
Supply Ability | 5000TONS /Month |
Packaging | Protective film/Craft paper/Cottom film/Carton box/Pallet |
Shipping Port | Xingang Port,China |
Lead time | 5-10 days for mold and sample delivery time. 10-15 days after receiving deposit for full container |
Why choose us
1. Continuous service and support
2.Competitive prices
3. Long quality, reliability and product life
4. A diversity of experienced and skilled workers
5. Apply professional knowledge
6. Coordinate customized R&D plans
Advantages of our products:
1. Strictly test the structure to withstand extreme weather conditions.
Flexibility and adjustability. Intelligent design reduces installation difficulty in most cases.
3. Various solar energy installed guide rail, can adapt to different wind speed and snow load.
4. The length of guide rail can be customized according to different projects.
5. Color can be anodized black or silver.
6. Corrosion resistance and high strength.